May 6, 2007 |
|
Last Look at the Old School House Apartments |
|
May 16, 2007 |
|
Interior Demolition Begins |
|
May 30, 2007 |
|
Internal Gutting Nearly Complete |
|
June 29, 2007 |
|
Framing Goes In |
|
July 15, 2007 |
|
Foundation Repair Needed |
|
July 23, 2007 |
|
New Lower Level Entry
Created |
|
August 22, 2007 |
|
Foundation Walls
Stabilized With 15 Tie-Backs |
|
August 24, 2007 |
|
Porches and Walks Removed |
|
October 2, 2007 |
|
New Rear Deck Slab
Poured |
|
October 3, 2007 |
|
Basement Walls Framed
and Capped |
|
October 17, 2007 |
|
Stone Foundation Exterior Tuckpointed |
|
October 23, 2007 |
|
Foundation Openings Blocked In |
|
October 24, 2007 |
|
Hydroseal Foundation Coating Applied |
|
October 24, 2007 |
|
Front Sill Section Replaced |
|
October 24, 2007 |
|
Basement Windows Converted to Glass Block |
|
October 25, 2007 |
|
Steelwork Gets Heat Resistant Paint |
|
October 25, 2007 |
|
New Deck Corner Post Installed |
|
October 29, 2007 |
|
Lower Level Walls Framed |
|
November 20, 2007 |
|
Basement Ceiling Leveled |
|
November 22, 2007 |
|
Rear Deck Stairs Rebuilt |
|
December 10, 2007 |
|
Upper Floor Ceilings Leveled |
|
December 15, 2007 |
|
Plumbing and HVAC Ductwork Installed |
|
December 20, 2007 |
|
Front Drainage Improved |
|
March 26, 2008 |
|
Sprinkler System Roughed In |
|
March 28, 2008 |
|
Electrical Circuits Installed |
|
April 16, 2008 |
|
Douglas Elementary School Returns 1891 Bell
to Old School House |
|
April 22, 2008 |
|
Old School House Bell Lifted Into Belfry |
|
April 26, 2008 |
|
Technical Wiring Added |
|
May 21, 2008 |
|
Upper Rooms Drywalled |
|
June 10, 2008 |
|
Main Floor Ceiling Drywalled |
|
June 20, 2008 |
|
Main Floor Rooms Drywalled |
|
June 28, 2008 |
|
Volunteers Move Shrubs For Front Walkway Clearance |
|
July 7, 2008 |
|
First Floor Primer Applied |
|
July 9, 2008 |
|
Main Floor Sprinkler System Completed |
|
July 10, 2008 |
|
Front Stairway Landings Installed |
|
July 10, 2008 |
|
Main Floor Windows Prepared |
|
July 11, 2008 |
|
Air Conditioning Pad Readied |
|
July 11, 2008 |
|
Main Floor Trim & Doors Added |
|
July 21, 2008 |
|
Front Entry Rebuilt |
|
July 22, 2008 |
|
Exterior Paint Preparation Begins |
|
July 24, 2008 |
|
Front Walk and Porch Forms Built |
|
July 25, 2008 |
|
Front Walk & Porch Concrete Poured |
|
July 25, 2008 |
|
Window Wells Added |
|
July 25, 2008 |
|
Upper Level Trim Started |
|
July 28, 2008 |
|
Bricks Laid for Walks & Porch |
|
July 29, 2008 |
|
Exterior Priming Applied |
|
July 30, 2008 |
|
Upper Level Rooms Primed |
|
July 31, 2008 |
|
Main Floor Flooring Laid |
|
August 4, 2008 |
|
Main Floor Baseboards Added |
|
August 4, 2008 |
|
Rear Siding Replaced |
|
August 4, 2008 |
|
Bell Rope Cabinet and Mail Slots Built In |
|
August 5, 2008 |
|
Main Stairway Installed |
|
August 5, 2008 |
|
Main Floor
Trim Primed |
|
August 5, 2008 |
|
Lower Level
Stairwell Guard Rail Built |
|
August 7, 2008 |
|
Air
Conditioning Compressors Installed |
|
August 7, 2008 |
|
Main Floor
Ceiling Fixtures Completed |
|
August 8, 2008 |
|
Main Floor
Rooms Painted |
|
August 8, 2008 |
|
Kitchenette
Cabinets Recycled |
|
August 11, 2008 |
|
Exterior
Painted Historically Authentic White |
|
August 11, 2008 |
|
Main Floor
Rest Room Done |
|
August 11, 2008 |
|
Main Floor
Door Hardware Added |
|
August 11, 2008 |
|
Front Doorway
Finished |
|
August 12, 2008 |
|
Drinking
Fountain Installed |
|
August 12, 2008 |
|
Discovery
Center Carpet Laid |
|
August 12, 2008 |
|
Exhibit Hall
Rear Doors Hung |
|
August 12, 2008 |
|
Rear Hall Door
Hung |
|
August 12, 2008 |
|
Front Yard
Graded |
|
August 13, 2008 |
|
Building
Prepared For Major-Donor Preview |
|
August 13, 2008 |
|
Floor Coating
Applied |
|
August 14, 2008 |
|
Main Floor
Electrical Work Completed |
|
August 14, 2008 |
|
Ramp Railings
Installed |
|
August 14, 2008 |
|
Major Donors
Thanked With "Sneak Peek" Party |
|
August 20, 2008 |
|
Storm Windows
Rehung |
|
August 20, 2008 |
|
Upper Floor
Doors & Trim Installed |
|
August 25, 2008 |
|
Stair Treads
Coated |
|
August 25, 2008 |
|
Track Lighting
Installed |
|